CO Objects (3.0F with 4.5B additions as needed)

COBK (doc head) & COEP (line items)


VRGNG
VRGCO
VRGSV
TXT
Transaction
CO activity
Status admin.
Description
ABUD

X
Display in budgeting
ACDC

X
Change date
AEBL

X
Create change document
AMST

X
Change milestone
AOCB

X
Block assembly order
AOCR

X
Unblock assembly order
AREL

X
Change relationship
AZAF


Down payment request
AZBU


Down payment
AZUM


Down payment - transfer postg
BABL

X
Wrap
BABS

X
Close
BFRE

X
Release
BFRZ

X
Revoke status "Released"
BLOC

X
Lock
BTAB

X
Technically complete
BTCL

X
Tech compl revoke created
BTCT

X
Tech compl revoke part rel'd
BUAA

X
Complete back to tech complete
BUAB

X
Revoke status "Closed"
BUNL

X
Unlock
BUTA

X
Revoke technical completion
CC01

X
Inspection request for ECR
CC02

X
Complete ECR inspection
CC03

X
Approve ECR
CC04

X
Withdraw approval for ECR
CC05

X
Convert ECR
CC06

X
Complete ECO
CC07

X
Release ECO
CC08

X
Unlock
CC09

X
Lock change
CC10

X
Refuse change request
CC11

X
Change request incomplete
CC12

X
ECO complete
CC21

X
Object: change possible
CC22

X
Object: change not necessary
CC23

X
Object: change not possible
CC24

X
Object: complete change
CC25

X
Object: release change
CC26

X
Object: errors in change
CC27

X
Object: Error corrected
COFM


CO-FM integration
COIN
X

CO: Interface (FI transactions create this transaction code)
CONF

X
Change configuration data
CORR


Adjustment posting
CORT


Temporary adjusting entry
CPPA
X

ABC process assessment: actual
CPPP
X

ABC process assessment: plan
CPRA
X

ABC resource assessment: act.
CPRP
X

ABC resource assessment: plan
CRAB

X
Terminate control recipe
CRCR

X
Create control recipe
CRFI

X
Set ctrl. recipe to "finished"
CRSN

X
Create subnetwork
CTPD

X
Delete process instructions
CTPG

X
Generate process instructions
EBRC

X
Create electronic batch record
EBRQ

X
Archive insp. lot for PI order
EINB

X
Include master recipe
FIPL

X
Financial budgeting
GLU1


Transfer Ext. system -> FI-GLX
GMPD

X
Undo order approval
GMPG

X
Grant single order approval
HRBV


Preliminary posting in HR
IKOS

X
Estimate expense
ILCR

X
Create inspection lot
ILDL

X
Delete inspection lot
INAK

X
Set object inactive
INAZ

X
Reset object inactive
ISHL


ISH: Hospitals
KABF


Manual entries analysis
KABG
X
X
Automatic results analysis
KABK

X
Settlement assignment
KABM
X
X
Manual results analysis
KABV

X
Maintain settlement rule
KAFD


External data transfer
KAFM
X

Financial data
KALD

X
Create cost estimate
KALZ

X
Reset cost estimate
KAUS
X
X
Calculate scrap
KAVM


Clear down paymnt with PO ref.
KAVO


Clear down payment w/o PO ref.
KAVR


Value added tax finance data
KAZI
X
X
Actual CCtr imputed costs
KAZM


Down pymts re purchase orders
KAZN


Down paym. clearance w/PO ref.
KAZO
X

Down payment
KAZP
X
X
Planned CCtr imputed costs
KAZV


Down payment clearing
KBFC

X
Availability control
KBFR

X
Budget release
KBLO

X
Funds block
KBLZ

X
Payment transfer
KBN0

X
Budget supplement
KBR0

X
Budget return
KBU1

X
Sender of carryover
KBU2

X
Receiver of carryover
KBU3

X
Sender of advance
KBU4

X
Receiver of advance
KBU5

X
Transfer of carryover
KBU6

X
Transfer of advance
KBUD

X
Budgeting
KBUE

X
Budget transfer (receiver)
KBUS

X
Budget transfer (sender)
KBUT

X
Budget transfer (transfer)
KBW1

X
Sender of carryover
KBW2

X
Receiver of carryover
KBW3

X
Sender of advance
KBW4

X
Receiver of advance
KBW5

X
Transfer of carryover
KBW6

X
Transfer of advance
KCOM

X
Funds commitment
KEKB
X

Unit costing (basis)
KEKP


Unit costing (primary)
KEKS


Unit costing (secondary)
KEKZ
X

Unit costing (surcharge)
KEPB

X
Write budget line items
KEPP

X
Write plan line items
KFOR

X
Revenue commitment
KFPI
X
X
Fixed price allocation
KFPP
X
X
Fixed price agreement
KMOB

X
Manual funds reservation
KOAE


Actual settlement (external)
KOAL
KOAO


X


X

Actual settlement of IAA (excluded from VA90 expenses)
Actual settlement
(physical plant settlements - extract to ADABAS) (excluded from VA90 expenses)

KOAP
X
X
Plan settlement
KOAQ

X
Debit from actual settlement
KOAR


Credit from actual settlement
KOAV


Settlement of variance data
KOAW


Settlement of RA data
KOLI
X
X
Collective order delivery
KOR1


Order rec: new order
KOR2


Order rec: amended order
KOR3


Order rec: reversal
KOR4


Order rec: plan amendment
KPAY

X
Payment reservation
KPIV
X
X
Actual cost distrib. cost obj.
KPPB
X

Create plan from ref. object
KPPP


Create plan frm ref. obj. (pr)
KPPS


Create plan frm ref. obj. (sc)
KPPZ
X

Create surcharge from ref.obj.
KPRE

X
Funds commitment
KPUW


Plan revaluation
KRAT


LIS trnsfr: act. stat. key fig
KRES

X
Funds reservation
KRPT


LIS trnsfr: pln stat. key fig.
KSD0


Quotation pricing
KSI0
X

Split actual
KSI1


Split actual (primary)
KSI2


Split actual (secondary)
KSII
X
X
Calculate act. activity price
KSOP
X

Compute prim. target costs
KSOS
X

Compute sec. target costs
KSP0
X

Split plan
KSP1


Split plan (primary)
KSP2


Split plan (secondary)_
KSPA
X

CCtr assessment to CO-PA
KSPB
X

Plan assessment to result
KSPI


Activity price computation (EB, OH, lab allocations create this transaction code)
KSPS


Plan reconciliation
KSTE

X
Unit costing (planning)
KSTP

X
Total cost planning
KSTR

X
Revenue planning (total)
KSWP
X

Calc. primary tgt costs (WIP)
KSWS
X

Calc.secondary tgt costs (WIP)
KVAR
X
X
Calculation of variances
KZPI
X
X
Actual surcharges (periodic)
KZPP
X
X
Planned surcharges (periodic)
KZRI
X
X
Interest calculation (actual)
KZRP
X
X
Interest calculation (plan)
LKZS

X
Set deletion indicator
LVMS

X
Set deletion flag
LVMZ

X
Remove deletion flag
MAAK

X
Activate rent adjustment
MABR

X
Demolish
MAER

X
Determine rent adjustment
MAST

X
Reverse rent adjustment
MAVV

X
Conclude commerc. prov.agrmnt
MBST

X
Include in portfolio
MBSV

X
Intended for portfolio
MCAE

X
Change management agreement
MCAK

X
Activate management agreement
MCAL

X
Create management agreement
MCLO

X
Mark mgt agreemt for deletion
MEAE

X
Change rental unit
MEAN

X
Create rental unit
MELO

X
Delete rental unit
MEZL

X
Del. alloc. RU -> Bldg/Prprty
MEZO

X
Assign RU -> bldng/prprty
MHAK

X
Activate fee adjustment
MHER

X
Determine fee adjustment
MHST

X
Cancel fee adjustment
MKAU

X
Purchase
MKFV

X
Intended for purchase
MKON

X
Real estate object assignment
MOAE

X
Change object
MOAL

X
Create object
MOLO

X
Delete object
MSEA

X
Reset acct ass.block generic.
MSEM

X
Reset master data block gener.
MSSA

X
Block acct assignmnt generic.
MSSK

X
Set real est.acct assign.block
MSSM

X
Block master data generically
MTEI

X
RU division declaration
MVAB

X
RU inspection
MVAC

X
Activate rental agrmnt for RU
MVAE

X
Change rental agreement
MVAG

X
Create comm. rental agreement
MVAN

X
Create rental agrmnt for RU
MVAR

X
Cancel inspection for RA
MVAW

X
Create resident.rental agrmnt
MVBA

X
Remove transaction block
MVBS

X
Set transaction block
MVDA

X
Print rental agreement changes
MVDR

X
Print rntl agrmnt: First print
MVFA

X
Change released rental agrmnt
MVFG

X
Rel. comm.rent.agrmnt created
MVFR

X
Release rental agreement
MVFV

X
Rel. provisional comm. agrmnt
MVFW

X
Rel. resident. rental agrmnt
MVKR

X
Cancel sale
MVKS

X
Rent agrmnt: Rev. cancelation
MVKT

X
Repay security deposit
MVKU

X
Cancel rental agreement
MVKV

X
Intended for sale
MVKZ

X
Reverse security depos.repmnt
MVLO

X
Delete rental agreement
MVRK

X
Sell
MWUN

X
Economic ruin
PAPL
X

Sales/profit plan
PCAA


Act.assessm.in PrCtr Acctng
PCAD


Act.alloc. in PrCtr Acctng
PCAP


Profit center acctg - planning
PCPA


Pln.assessm.in PrCtr Acctng
PCPD


Pln.alloc. in PrCtrAcctng
PMM1

X
Postpone notification
PMM2

X
Give notification
PMM3

X
Assign to order
PMM4

X
Conclude notification
PMM5

X
Print notification
PMM6

X
Renotify
PMM7

X
Terminate order allocation
PMM8

X
Set deletion flag
PMM9

X
Remove deletion flag
PMMA

X
Archive notification
PMO1

X
Create equipment
PMO2

X
Install equipment
PMO3

X
Dismantle equipment
PMO4

X
Structure equipment hierarchy
PMO5

X
Explode equipment hierarchy
PMO6

X
Terminate configuration ref
PMOA

X
Change technical object
PMOB

X
Enter PM planing data
PMOC

X
Enter PM processing data
PMS1

X
Goods receipts
PMS2

X
Order assignment
PMS3

X
Delivery note assignment
PMS4

X
Service contract assignment
PMS5

X
Delivery to customer
PMS6

X
Assignment in test condition
PMS7

X
Return to stock
PMS8

X
Goods issues
PMS9

X
Blocked condition
PMSA

X
Delete assignmnt to delivery
PMSB

X
Delete assignmnt to order
PMSC

X
Delete assign. to inspectn lot
PMSD

X
Stock transfer
PMSE

X

PMSU

X
Stock transfer (one-step)
PMT1

X
Deliv. to customer consignment
PMT2

X
Outw movemt fm consigmt custmr
PMT3

X
Deliv to custmr retn packaging
PMT4

X
Outw movemt fm retn pakg custr
PMT5

X
Return fm custr consignment
PMT6

X
Inwd movemt to consgnmt custr
PMT7

X
Return fm custr retn packg
PMT8

X
Inwd movemt to custr retn pckg
PPMA

X
Material assembly
PRC3


FI data transfer to EC-PCA
PRC4


Trans.bal.sheet items to PrCtr
PRC5


Profit center document entry
PSAT

X
Assignment order/WBS
PSCO

X
Acct. assignment order/project
PSCT

X
Schedule basic dates
PSDE

X
Delete basic dates
PSDL

X
Delete element
PSDP

X
Delete forecast dates
PSE1

X
Set basic start
PSE2

X
Set basic finish
PSEA

X
Unlock assignment
PSEB

X
Unlock budgeting
PSEI

X
Expand structure
PSEM

X
Unlock master data
PSEP

X
Unlock planning
PSET

X
Unlock dates
PSEV

X
Shift basic dates
PSGE

X
Approval
PSIT

X
Schedule actual dates
PSP1

X
Set forecast start
PSP2

X
Set forecast finish
PSPS

X
Lock planning
PSPT

X
Schedule forecast dates
PSPV

X
Shift forecast dates
PSSA

X
Lock assignment
PSSB

X
Lock budgeting
PSSM

X
Lock master data
PSST

X
Lock dates
PSTE

X
Confirm WBS
PSTF

X
Partially release project
PSTS

X
Partially confirm WBS
PSTV

X
StdVal from subnetwork
PSTX

X
Assign PS texts
PSUE

X
Copy basic -> forecast
PSUP

X
Copy forecast -> basic
PSVE

X
Change structure
QC02

X
Create quality certif. profile
QC04

X
Release quality cert. profile
QC06

X
Lock quality certif. profile
QC08

X
Assign quality certif. profile
QC10

X
Quality cert. prof.: deln flag
QM02

X
Choose plan for inspection lot
QM04

X
Create insp. characteristics
QM06

X
Determine sample
QM07

X
Change planned lot quantity
QM08

X
Consider quality level
QM09

X
Lot reset allowed
QM10

X
Set insp. lot to skip lot
QM11

X
Change inspection lot
QM12

X
Print sample drawing instructn
QM14

X
Print inspection instruction
QM15

X
Include in subsys. task list
QM16

X
Start quality inspection
QM17

X
Transmit lot to subsystem
QM18

X
Record inspection results
QM19

X
Record long-term characterist.
QM20

X
Access usage decision
QM21

X
Work list for insp. completion
QM22

X
End inspection - complete
QM23

X
Record defects
QM24

X
Close inspection - short-term
QM26

X
Close inspection - complete
QM27

X
Close partial lot
QM28

X
Cancel inspection - short-term
QM29

X
Create part. lot for insp. lot
QM30

X
Cancel inspection - complete
QM31

X
Reset status 'SPRQ'
QM32

X
Reset short-term ins. closing
QM33

X
Reset insp. closing w/o char.
QM34

X
Reset complete insp. closing
QM35

X
Confirm certificate receipt
QM36

X
Make usage decision
QM38

X
Start inv. pstg after UsageDec
QM40

X
Start inv. pstg bef. UsageDec
QM41

X
Inventory posting required
QM42

X
Complete inventory posting
QM43

X
Transfer results
QM44

X
Change usage decision
QM45

X
Insp.lot/part.lot for certif.
QM46

X
Update statistics
QM47

X
Transfer all results
QM48

X
Update quality level
QM50

X
Update quality info record
QM52

X
Cancel quality level change
QM53

X
Flag cancellation
QM54

X
Cancel inspection lot
QM55

X
Reset cancellation
QM56

X
Lock insp. lot for archiving
QM57

X
Reset archiving lock
QM58

X
Archive inspection lot
QM59

X
Read lot from archive
QM60

X
Delete detailed data for lot
QM62

X
Delete samples for lot
QM64

X
Delete characterist./operation
QM66

X
Delete inspection lot
QM67

X
Lot for process documentation
QM68

X
Revoke usage decision
QM90

X
Follow-up action - variant 1
QM91

X
Follow-up action - variant 2
QM92

X
Follow-up action - variant 3
QM93

X
Follow-up action - variant 4
QM94

X
Follow-up action - variant 5
QM95

X
Follow-up action - variant 6
QM96

X
Follow-up action - variant 7
QM97

X
Follow-up action - variant 8
QM98

X
Follow-up action - variant 9
QM99

X
Follow-up action - variant 10
QN40

X
Release task
QN41

X
Complete task
QN42

X
Task successful
QN90

X
Follow-up to notificatn Var 01
QN91

X
Follow-up to notificatn Var 02
QN92

X
Follow-up to notificatn Var 03
QN93

X
Follow-up to notificatn Var 04
QN94

X
Follow-up to notificatn Var 05
QN95

X
Follow-up to notificatn Var 06
QN96

X
Follow-up to notificatn Var 07
QN97

X
Follow-up to notificatn Var 08
QN98

X
Follow-up to notificatn Var 09
QN99

X
Follow-up to notificatn Var 10
QN9A

X
Follow-up to notificatn Var 11
QN9B

X
Follow-up to notificatn Var 12
RFBU

X
FI: Postings
RFBV


FI prelim. posting of invoices
RFIG

X
FI: Memo postings
RFLC


FI-LC: Business area consolid.
RFRK


CO -> FI reconcil. posting
RFST

X
FI: Statistical postings
RGG0


FI-GLX Actual postings (GB11)
RGG1


FI-GLX Plan postings (GB11)
RGL0


FI-GLX Actual postings (GB01)
RGL1


FI-GLX Plan postings (GB01)
RKAL


Set up reconciliation ledger
RKIB
X
X
Actual periodic repostings
RKIL
X
X
Actual inverse activity alloc.
RKIU
X
X
Actual assessment (Physical Plant assessments create these CO transactions)
RKIV
X
X
Actual distribution (Physical Plant Distributions create these CO transactions)
RKL
RKLN

X
X
Actual activity allocation (CATS can create these CO transactions)
Revaluation with Actual Price ( Excluded from VA90 expenses in 4.5B)

RKN
X

Actual non-alloc. activities
RKP1
X
X
Planning primary costs
RKP2
X

Planning activities
RKP3
X
X
Planning activity input
RKP4
X
X
Planning stat. key figures
RKP5
X
X
Planning revenues
RKP6
X

Planning activity-dep. costs
RKP7
X

Planning act.-dep. act. input
RKP8
X

Planning order costs
RKP9
X

Planning act.-dep. order costs
RKPB
X
X
Planned periodic reposting
RKPL
X
X
Planned inverse activity alloc
RKPQ


Manual cost planning
RKPU
X
X
Planned assessment
RKPV
X
X
Planned distribution
RKPW
X

Secondary order cost planning
RKPX
X

Sec.act.-dep.order cost planng
RKPZ
X

Planning: surcharge credits
RKRF


CO -> FI reconcil. posting
RKS
X
X
Enter statistical key figures
RKU1
X
X
Repost costs (KB11 transfer cost overruns create these activity types)
RKU2
X
X
Repost revenue
RKU3
X
X
Repost CO line items
RKWD


Alloc. of non-meas. activities
RMAF

X
Release operation
RMAP

X
Update routing
RMBA

X
Material purchase requisition (requisitions)
RMBE

X
Material purchase order (po)
RMBL

X
Material debit/credit
RMDR

X
Print order
RMEA

X
Assign
RMEB

X
Remove assignment
RMEP

X
Schedule
RMEZ

X
Remove dispatching
RMKA

X
Check capacity
RMKE

X
Determine costs
RMKF

X
Release component
RMKL

X
Delete component
RMLV

X
WMS: mat. provisn prodn order
RMM1


Settlement to material ledger
RMM2


Material ledger initialization
RMML

X
Material layer (LIFO)
RMNS

X
Reread master data
RMPR

X
Change in material price
RMRP

X
Incoming invoice (my CP documents have this transaction type)
RMRU

X
Confirm
RMSQ

X
Delete sequence
RMTD

X
Partial printing
RMTF

X
Partially release order
RMTM

X
Schedule order
RMUP

X
Reschedule
RMVA

X
Change
RMVC

X
Maintain operation number
RMVF

X
Check PRT availability
RMVL

X
Delete operation
RMVM

X
Check material availability
RMVP

X
Change routing
RMVR

X
Confirm operation
RMVS

X
Release PRT for use
RMVT

X
Lock PRT from use
RMVU

X
Use production resources/tools
RMWA

X
Goods Movement
RMWE

X
Goods receipt for purch. order
RMWF

X
Goods receipt for prodn. order
RMWI

X
Inventory difference
RMWL

X
Goods issue delivery
RMWQ


Goods movement for usage dec.
SD00


Billing document
SDDN

X
Create delivery
SDEF

X
Activate final billing doc.
SDES

X
Revoke "Fully billed"
SDGI

X
Post goods issue
SDIN

X
Create billing document
SDOR

X
Create sales document
SDQU

X
Create quotation
SDRQ

X
Create inquiry
SPAB

X
Close standard WBS
SPFR

X
Release standard WBS
 