|
|
Technical name
|
Transaction
|
|
|
Worklist for Project Period-End Closing
|
SAP_PS_PEREND_PROJ_WLM
|
WLMPS
|
Worklist Monitor
|
1
|
Archiving
|
SAP_PS_ARCHIVING
|
KOAA
|
Archiving: Settlement Documents
|
|
|
|
FMRE_ARCH
|
Archiving: Funds Commitments
|
|
|
|
CN80
|
Archiving: Project Structures
|
|
|
|
KBEA
|
Transfer Price Agreement/Allocation: Set Deletion Indicator
|
|
|
|
KBEB
|
Transfer Price Agreement/Allocation:Generate Archive
|
|
|
|
KBEC
|
Transfer Price Agreement/Allocation:Manage Archive
|
|
|
|
CN99
|
Archiving Standard Networks
|
2
|
Requirements Grouping
|
SAP_PS_GROUPING
|
GRM4
|
Requirements Grouping: Assign WBS Elements Individually
|
|
|
|
GRM3
|
Requirements Grouping: Assign WBS Elements Using List
|
|
|
|
GRM1
|
Requirements Grouping: Display Assigned WBS Elements
|
|
|
|
GRM5
|
Requirements Grouping: Assign Planning Groups
|
|
|
|
GRM2
|
Requirements Grouping: Display Assigned Planning Groups
|
|
|
|
GRM7
|
Requirements Grouping: Display Assigned Planning WBS Elements
|
3
|
Claim Management
|
SAP_PS_CLAIM
|
CLM1
|
Create Claim
|
|
|
|
CLM2
|
Change Claim
|
|
|
|
CLM3
|
Display Claim
|
|
|
|
CLM10
|
Claim Overview
|
|
|
|
CLM11
|
Claim Hierarchy
|
4
|
Collaboration
|
SAP_PS_CEP
|
CMWO
|
CEP: Configuration Management
|
|
|
|
CEP_R3_MON
|
CEP: Monitoring
|
|
|
|
CEO1
|
CEP: Display Folder
|
|
|
|
CEO2
|
CEP: Transfer Folder
|
|
|
|
CEO3
|
CEP: Check Folder
|
5
|
Executing Controlling Reports
|
SAP_PS_EXECUTE_CO_REPORTS
|
CJE0
|
Execute Report: Hierarchy Report
|
|
|
|
CJEB
|
Execute Report: Hierarchy Report in Background
|
|
|
|
GR55
|
Execute Report: Cost Element Report
|
6
|
Displaying Documents
|
|
CN05
|
Display Project Texts
|
|
|
|
CV03N
|
Document Management: Display Documents
|
7
|
Maintaining and Displaying Documents
|
SAP_PS_DOCUMENTS
|
CN04
|
Edit Project Texts
|
|
|
|
CN05
|
Display Project Texts
|
|
|
|
CV01N
|
Document Management: Create Documents
|
|
|
|
CV02N
|
Document Management: Change Documents
|
|
|
|
CV03N
|
Document Management: Display Documents
|
|
|
|
CV04N
|
Document Management: Find Documents
|
8
|
Line Item Reports
|
SAP_PS_REP_LINE_ITEM
|
CJI3
|
Actual Costs/Revenues
|
|
|
|
CJI5
|
Commitments
|
|
|
|
CJI4
|
Planned Costs/Revenues
|
|
|
|
CJIB
|
Budget
|
|
|
|
CJIA
|
Actual Payments/Payment Commitments
|
|
|
|
CJI9
|
Hierarchical Cost/Revenue Planning
|
|
|
|
CJIC
|
Display Project Settlement Line Items
|
|
|
|
CJID
|
Display Project Settlement Line Items
|
9
|
Reports on Revenues and Earnings
|
SAP_PS_REP_REVENUES
|
S_ALR_87013562
|
Annual Overview
|
|
|
|
S_ALR_87013563
|
Structure
|
|
|
|
S_ALR_87013564
|
Plan/Actual/Variance
|
|
|
|
S_ALR_87013566
|
Actual Contribution Margin
|
|
|
|
S_ALR_87013567
|
Quotation/Order/Plan/Actual
|
|
|
|
S_ALR_87013568
|
Project Result
|
|
|
|
S_ALR_87013569
|
Incoming Orders/Orders on Hand
|
|
|
|
S_ALR_87013570
|
Actual/Plan/Absolute Variance/% Variance %
|
|
|
|
S_ALR_87013571
|
Actual - Plan- Comparison per Period
|
|
|
|
S_ALR_87013572
|
Project Result
|
10
|
Progress Determination
|
SAP_PS_PROGRESS
|
CNE1
|
Progress Determination: Individual Processing
|
|
|
|
CNE2
|
Progress Determination: Collective Processing
|
11
|
Overall CO Planning for Projects
|
SAP_PS_OVERALL_CO_PLAN_PROJ
|
CJ40
|
Change Overall Costs in the WBS
|
|
|
|
CJ41
|
Display Overall Costs in the WBS
|
|
|
|
CJ42
|
Change Revenues in the WBS
|
|
|
|
CJ43
|
Display Revenues in the WBS
|
|
|
|
CJ9K
|
Network Costing
|
|
|
|
CJ9FS
|
Copy Planning
|
12
|
Progress Information System
|
SAP_PS_REP_PROGRESS
|
CNE5
|
Progress Analysis: Structure Overview
|
|
|
|
S_ALR_87015124
|
Progress Analysis: Project Hierarchy
|
|
|
|
S_ALR_87015124
|
Progress Analysis: Detail
|
|
|
|
CNMT
|
Milestone Trend Analysis
|
13
|
Materials Information System
|
SAP_PS_REP_MATERIAL
|
S_ALR_87015076
|
Material Components
|
|
|
|
MD04
|
Requirements/Inventory
|
|
|
|
CO24
|
Missing Parts
|
|
|
|
MD09
|
Pegged Requirements
|
|
|
|
MD4C
|
Order Report
|
|
|
|
MB25
|
Reservations
|
|
|
|
S_ALR_870156067
|
Planned Orders
|
|
|
|
ME3K
|
Outline Agreements
|
|
|
|
MBBS
|
Valuated Project Stock
|
|
|
|
ME5J
|
Purchase Requisitions for Project
|
|
|
|
ME5K
|
Purchase Requisitions for Account Assignment
|
|
|
|
ME2J
|
Purchasing Documents for Project
|
|
|
|
ME2K
|
Purchase Orders for Account Assignment
|
14
|
Structure Information System
|
SAP_PS_REP_STRUCT
|
CN41
|
Structure Overview
|
|
|
|
S_ALR_87015065
|
Individual Overview: Project Definition
|
|
|
|
S_ALR_87015066
|
Individual Overview: WBS Elements
|
|
|
|
S_ALR_87015069
|
Individual Overview: Networks
|
|
|
|
S_ALR_87015070
|
Individual Overview: Activities
|
|
|
|
S_ALR_87015068
|
Individual Overview: Orders
|
|
|
|
S_ALR_87015077
|
Individual Overview: Sales Documents
|
|
|
|
S_ALR_87015078
|
Individual Overview: Sales Document Items
|
|
|
|
S_ALR_87015072
|
Individual Overview: Relationships
|
|
|
|
S_ALR_87015073
|
Individual Overview: Milestones
|
|
|
|
CF16
|
On Materials
|
|
|
|
CF17
|
On Document
|
|
|
|
CF15
|
On PRT Master
|
|
|
|
CF18
|
On Equipment
|
|
|
|
CN60
|
On Project/Network
|
15
|
Information System Tools
|
SAP_PS_REP_TOOLS
|
CJE4
|
Hierarchy Reports: Create Form
|
|
|
|
CJE5
|
Hierarchy Reports: Change Form
|
|
|
|
CJE6
|
Hierarchy Reports: Display Form
|
|
|
|
CJE1
|
Hierarchy Reports: Create
|
|
|
|
CJE2
|
Hierarchy Reports: Change
|
|
|
|
CJE3
|
Hierarchy Reports: Display
|
|
|
|
CJE0
|
Hierarchy Reports: Execute
|
|
|
|
GRR1
|
Cost Element Reports: Create Report Painter Report
|
|
|
|
GRR2
|
Cost Element Reports: Change Report Painter Report
|
|
|
|
GRR3
|
Cost Element Reports: Display Report Painter Report
|
|
|
|
GRR4
|
Cost Element Reports: Delete Report Painter Report
|
|
|
|
CJH1
|
Summarization: Inheritance
|
|
|
|
CJH2
|
Summarization: Inheritance Evaluation
|
|
|
|
KKRC
|
Summarization: Summarization
|
|
|
|
KKR0
|
Summarization: Hierarchy
|
|
|
|
CJSA
|
Data Transfer to EIS
|
16
|
Actual Payments in Projects
|
SAP_PS_PAYMENTS_PLAN
|
FMWA
|
Create Funds Transfer
|
|
|
|
FMWC
|
Display Funds Transfer
|
17
|
Project Year-End Closing
|
SAP_PS_PROJ_YEAREND
|
CJCF
|
Carry Forward Commitment
|
|
|
|
CJCO
|
Carry Forward Budget
|
18
|
Cost Reports
|
SAP_PS_REP_COSTS
|
S_ALR_87013532
|
Plan/Actual/Variance
|
|
|
|
S_ALR_87013533
|
Plan/Actual/Commitment/Remaining Plan/Assigned
|
|
|
|
S_ALR_87013538
|
Project Version Comparison: Actual/Plan
|
|
|
|
S_ALR_87100185
|
Actual Costs per Month, Current Fiscal Year
|
|
|
|
S_ALR_87100188
|
Actual Costs: Aggregated
|
|
|
|
S_ALR_87100189
|
Actual/Planned Time Series
|
|
|
|
S_ALR_87100190
|
Actual/Plan/Variance per Project and Person Responsible
|
|
|
|
S_ALR_87013540
|
Forecast
|
|
|
|
S_ALR_87013541
|
Project Interest: Plan/Actual
|
|
|
|
S_ALR_87013542
|
Actual/Commitment/Total/Plan in Controlling Area Currency
|
|
|
|
S_ALR_87013543
|
Actual/Plan/Absolute Variance/% Variance %
|
|
|
|
S_ALR_87013544
|
Actual - Plan- Comparison per Period
|
|
|
|
S_ALR_87013545
|
Actual: Period Comparison
|
|
|
|
S_ALR_87013546
|
Commitments: Period Comparison
|
|
|
|
S_ALR_87013547
|
Plan: Period Comparison
|
|
|
|
S_ALR_87013548
|
Statistical Key Figures/Periods
|
|
|
|
S_ALR_87013549
|
Actual - Plan- Comparison, with Partner
|
|
|
|
S_ALR_87013555
|
Project Result
|
|
|
|
S_ALR_87013556
|
Funds Overview
|
|
|
|
S_ALR_87013558
|
Plan/Actual/Commitment/Remaining Plan/Assigned
|
19
|
Mass Changes
|
SAP_PS_MASS_CHANGE
|
CNMASS
|
Execute Mass Changes
|
|
|
|
CNMASSPROT
|
Mass Changes: Log
|
20
|
Materials in Projects
|
SAP_PS_MATERIAL
|
MM01
|
Create Material
|
|
|
|
MM02
|
Change Material
|
|
|
|
MM03
|
Display Material
|
|
|
|
CN33
|
BOM Transfer
|
|
|
|
MD51
|
Project Material Requirements Planning
|
|
|
|
MD50
|
Sales Order Material Requirements Planning
|
|
|
|
MD4C
|
Order Report
|
|
|
|
CO46
|
Order Progress Report
|
|
|
|
CO24
|
Backlog Processing: Missing Parts Information System
|
|
|
|
CO06
|
Backlog Processing: Materials
|
|
|
|
V_RA
|
Backlog Processing: Sales Orders
|
|
|
|
MDUP
|
Sales Order/Material Assignment: Edit
|
|
|
|
MDUS
|
Sales Order/Material Assignment: Display
|
|
|
|
CNL1
|
Create Delivery Information
|
|
|
|
CNL2
|
Change Delivery Information
|
|
|
|
CNL3
|
Display Delivery Information
|
|
|
|
CNS0
|
Delivery from Project
|
21
|
Displaying Materials in Projects
|
SAP_PS_MATERIAL_DISPL
|
MM03
|
Display Material Master Data
|
|
|
|
MD4C
|
Order Report
|
|
|
|
CO46
|
Order Progress Report
|
|
|
|
S_ALR_87015076
|
Material Components
|
22
|
Project Funds Commitments
|
SAP_PS_FUNDS_COMMITMENT
|
FMZ1
|
Create Funds Commitment
|
|
|
|
FMZ2
|
Change Funds Commitment
|
|
|
|
FMZ3
|
Display Funds Commitment
|
|
|
|
FMZ6
|
Reduce Funds Commitment
|
23
|
Project Period-End Closing: Individual Processing
|
SAP_PS_PEREND_PROJ_IND
|
CJB2
|
Settlement Rule: Individual Processing
|
|
|
|
PSW5
|
Periodic Repostings
|
|
|
|
CPTK
|
Template Allocation: Individual Processing
|
|
|
|
CJN1
|
Revaluation at Actual Prices: Individual Processing
|
24
|
Period-End Closing: Collective Processing
|
SAP_PS_PEREND_PROJ_COLL
|
CJB1
|
Settlement Rule: Collective Processing
|
|
|
|
PSW5
|
Periodic Reposting
|
|
|
|
CPTL
|
Template Allocation: Collective Processing
|
|
|
|
CJN2
|
Revaluation at Actual Prices: Collective Processing
|
|
|
|
CJ09
|
Commitment Overhead Calculation: Collective Processing
|
|
|
|
CJ45
|
Actual Overhead Calculation: Collective Processing
|
|
|
|
CJZ1
|
Interest Calculation: Collective Processing
|
|
|
|
CJ9M
|
Cost Forecast: Collective Processing
|
|
|
|
CJC1
|
Results Analysis: Check Status Validity Date
|
|
|
|
CJA1
|
Incoming Orders: Collective Processing
|
|
|
|
CJ8G
|
Settlement: Collective Processing
|
|
|
|
KKAJ
|
Execute Results Analysis: Collective Processing
|
|
|
|
KKAJP
|
Execute Results Analysis: Collective Processing
|
25
|
Project Periodic CO Planning
|
SAP_PS_PER_CO_PLAN_PROJ
|
KP04
|
Set Planner Profile
|
|
|
|
CJR2
|
Change Costs/Activity Inputs
|
|
|
|
CJR3
|
Display Costs/Activity Inputs
|
|
|
|
KSWB
|
Periodic Reposting
|
|
|
|
CJ9BS
|
Copy Project Planning
|
|
|
|
CJ9CS
|
Projects: Copy Actual to Plan
|
|
|
|
CPUL
|
Template Allocation: Collective Processing
|
|
|
|
CJ47
|
Overhead: Collective Processing
|
|
|
|
CJZ5
|
Interest Calculation: Collective Processing
|
|
|
|
CJC2
|
Results Analysis: Plan Status Changes
|
|
|
|
CJ9G
|
Settlement: Collective Processing
|
|
|
|
CJS2
|
Change Statistical Key Figures (WBS Element)
|
|
|
|
CJS3
|
Display Statistical Key Figures (WBS Element)
|
|
|
|
CJK2
|
Change Statistical Key Figures (Network)
|
|
|
|
CJK3
|
Display Statistical Key Figures (Network)
|
26
|
Evaluating Human Resources
|
SAP_PS_PERS_RES_EVAL
|
CMP9
|
Workforce Planning - Reporting
|
27
|
Planning Human Resources
|
SAP_PS_PERS_RES_PLAN
|
CMP2
|
Workforce Planning: Selection Project View
|
|
|
|
CMP3
|
Workforce Planning: Work
Center View
|
28
|
Planned Payments
|
SAP_PS_PAYMENTS_PLAN
|
CJ48
|
Payments in the WBS: Change
|
|
|
|
CJ49
|
Payments in WBS: Display
|
29
|
Project Budgeting
|
SAP_PS_BUDGET_PROJ
|
CJ30
|
Create Original Budget
|
|
|
|
CJ31
|
Display Original Budget
|
|
|
|
CJ37
|
Budget Supplement: Within Project
|
|
|
|
CJ36
|
Budget Supplement: To Project
|
|
|
|
CJ38
|
Budget Return: Within Project
|
|
|
|
CJ35
|
Budget Return: From Project
|
|
|
|
CJ32
|
Change Budget Release
|
|
|
|
CJ33
|
Display Budget Release
|
|
|
|
CJ3a
|
Change Budget Document
|
|
|
|
CJ3b
|
Display Budget Document
|
|
|
|
CJBV
|
Budget: Activate Availability Control
|
|
|
|
CJBW
|
Budget: Deactivate Availability Control
|
|
|
|
OPSX
|
Budget: Reset "Budgeted" Status
|
|
|
|
CJ34
|
Budget Transfer
|
30
|
Maintaining and Displaying Project Structures
|
SAP_PS_STRUCT
|
CJ20N
|
Project Builder
|
|
|
|
CJ27
|
Project Planning Board: Create Project
|
|
|
|
CJ2B
|
Project Planning Board: Change Project
|
|
|
|
CJ2C
|
Project Planning Board: Display Project
|
|
|
|
CJ2D
|
Structure Planning: Create Project
|
|
|
|
CJ20
|
Structure Planning: Change Project
|
|
|
|
CJ2A
|
Structure Planning: Display Project
|
|
|
|
CJV1
|
Create Simulation
|
|
|
|
CJV2
|
Change Simulation
|
|
|
|
CJV3
|
Display Simulation
|
|
|
|
CJV5
|
Delete Simulation
|
|
|
|
CJV7
|
Simulation: Logs
|
|
|
|
CN60
|
Change Documents: On Project/Network
|
|
|
|
CJ01
|
Work Breakdown Structure: Create
|
|
|
|
CJ02
|
Work Breakdown Structure: Change
|
|
|
|
CJ03
|
Work Breakdown Structure: Display
|
|
|
|
CN21
|
Network: Create
|
|
|
|
CN22
|
Network: Change
|
|
|
|
CN23
|
Network: Display
|
31
|
Display Project Structures
|
SAP_PS_STRUCT_DISPL
|
CJ20N
|
Project Builder
|
|
|
|
CJ2C
|
Project Planning Board: Display Project
|
|
|
|
CJ2A
|
Structure Planning: Display Project
|
|
|
|
CJV3
|
Display Simulation
|
|
|
|
CJ03
|
Display Work Breakdown Structure
|
|
|
|
CN23
|
Display Network
|
|
|
|
CJ13
|
Display WBS Element
|
|
|
|
KJH3
|
Display WBS Element Group
|
32
|
PS Input: Line Manager Generic Role
|
SAP_PS_LINE_MANAGER
|
CNR3
|
Work Center: Display Master Record
|
|
|
|
CR13
|
Work Center: Display Capacity
|
|
|
|
CMP3
|
Workforce Planning: Work
Center View
|
|
|
|
CMP9
|
Workforce Planning - Reporting
|
|
|
|
CM01
|
Capacity Evaluation, Work
Center View
|
33
|
Confirmations
|
SAP_PS_CONFIRM
|
CN25
|
Create Network Confirmation (Individual Processing)
|
|
|
|
CN28
|
Display Network Confirmation (Individual Processing)
|
|
|
|
CN29
|
Cancel Network Confirmation (Individual Processing)
|
|
|
|
CN27
|
Collective Confirmation Processing
|
|
|
|
CAT2
|
Timesheet: Enter Times
|
|
|
|
CAT3
|
Timesheet: Display Times
|
34
|
Maintaining Work
Center Master Data
|
SAP_PS_BASIC_WRKPL
|
CNR1
|
Work Center: Create Master Record
|
|
|
|
CNR2
|
Work Center: Change Master Record
|
|
|
|
CR11
|
Work Center: Create Capacity
|
|
|
|
CR12
|
Work Center: Change Capacity
|
|
|
|
CR21
|
Work Center: Create Hierarchy
|
|
|
|
CR22
|
Work Center: Change Hierarchy
|
35
|
Displaying Work
Center Master Data
|
SAP_PS_BASIC_WRKPL_DISPL
|
CNR3
|
Work Center: Display Master Record
|
|
|
|
CR13
|
Work Center: Display Capacity
|
|
|
|
CR23
|
Work Center: Display Hierarchy
|
|
|
|
CR05
|
Evaluation - Work
Center List
|
|
|
|
CR06
|
Evaluation - Cost
Center Assignment
|
|
|
|
CR07
|
Evaluation - Work
Center Capacity
|
|
|
|
CR08
|
Evaluation - Work
Center Hierarchy
|
|
|
|
CR10
|
Evaluation - Change Documents
|
|
|
|
CA83
|
Where-Used - Work
Center
|
|
|
|
CR15
|
Where-Used - Capacity
|
|
|
|
OP4A
|
Available Capacity - Shift Program
|
|
|
|
OP03
|
Available Capacity - Factory Calendar
|
36
|
Displaying Standard Structures
|
SAP_PS_STD_STRUCT_DISPL
|
CJ93
|
Display Standard WBS
|
|
|
|
CN03
|
Display Standard Network
|
|
|
|
CN13
|
Display Standard Milestones
|
37
|
Maintaining Standard Structures
|
SAP_PS_STD_STRUCT
|
CJ91
|
Standard WBS: Create
|
|
|
|
CJ92
|
Standard WBS: Change
|
|
|
|
CJ93
|
Standard WBS: Display
|
|
|
|
CN01
|
Standard Network: Create
|
|
|
|
CN02
|
Standard Network: Create
|
|
|
|
CN03
|
Standard Network: Create
|
|
|
|
CN98
|
Delete Standard Network
|
|
|
|
CU41
|
Standard Network Configuration Profile: Create
|
|
|
|
CU42
|
Standard Network Configuration Profile: Change
|
|
|
|
CU43
|
Standard Network Configuration Profile: Create
|
|
|
|
CA88
|
Replace Work Center
|
|
|
|
CA78
|
Replace PRT
|
|
|
|
CN11
|
Standard Milestone: Create
|
|
|
|
CN12
|
Standard Milestone: Change
|
|
|
|
CN13
|
Standard Milestone: Display
|
|
|
|
CN08
|
Network Parameters from Sales Order: Edi
|
|
|
|
CN09
|
Network Parameters from Sales Order:
|
|
|
|
CA83
|
Where-Used Lists: Standard Networks for Work Center
|
|
|
|
CA73
|
Where-Used Lists: Standard Networks for PRT
|
|
|
|
CJCS
|
Change Documents: For Standard WBS
|
|
|
|
CN61
|
Change Documents: For Standard Network
|
38
|
Maintaining Dates in Projects
|
SAP_PS_DATES
|
CJ2B
|
Project Planning Board: Change Project
|
|
|
|
CJ2C
|
Project Planning Board: Display Project
|
|
|
|
CJ21
|
Change Basic Dates
|
|
|
|
CJ22
|
Display Basic Dates
|
|
|
|
CJ25
|
Change WBS Dates
|
|
|
|
CJ26
|
Display WBS Dates
|
|
|
|
CJ23
|
Change Forecast Dates
|
|
|
|
CJ24
|
Display Forecast Dates
|
|
|
|
CN24
|
Overall Network Scheduling
|
|
|
|
CJ29
|
Project Scheduling
|
39
|
Displaying Dates in Projects
|
SAP_PS_DATES_DISPLAY
|
CJ26
|
Display WBS Dates
|
|
|
|
CJ22
|
Display Basic Dates
|
|
|
|
CJ24
|
Display Forecast Dates
|
|
|
|
CJ2C
|
Project Planning Board: Display Project
|
40
|
Monitoring Dates for Materials
|
SAP_PS_MONITOR_MAT_DATES
|
NWTM
|
Monitoring Dates
|
41
|
Actual Transfer Prices
|
SAP_PS_TRANSFER_PRICE_ACTUAL
|
CJG4
|
Transfer Price Allocation: Enter Using List
|
|
|
|
CJG3
|
Transfer Price Allocation: Display
|
|
|
|
CJG5
|
Transfer Price Allocation: Cancel
|
42
|
Planned Transfer Prices
|
SAP_PS_TRANSFER_PRICE_PLAN
|
CJF1
|
Transfer Price Agreement: Create
|
|
|
|
CJF2
|
Transfer Price Agreement: Change
|
|
|
|
CJF3
|
Transfer Price Agreement: Display
|
|
|
|
CJF4
|
Transfer Price Agreement: Change Using List
|
43
|
Summarized Cost Reports
|
SAP_PS_REP_COST_SUMMARIZ
|
S_ALR_87013576
|
Summarization Overview: Project Hierarchies
|
|
|
|
S_ALR_87013577
|
Summarization: Costs/Revenues/Expenditures/Receipts
|
|
|
|
S_ALR_87013578
|
Plan/Actual/Variance
|
|
|
|
S_ALR_87013579
|
Plan/Actual/Commitment
|
|
|
|
S_ALR_87013580
|
Actual/Plan/Variance
|
|
|
|
S_ALR_87013581
|
Actual/Plan/Commitment
|
|
|
|
S_ALR_87013582
|
Current/Cumulative/Total
|
|
|
|
S_ALR_87013583
|
Budget/Actual/Variance
|
|
|
|
S_ALR_87013584
|
Budget/Actual/Commitment
|
|
|
|
S_ALR_87013585
|
Plan/Actual/Variance
|
|
|
|
S_ALR_87013587
|
Actual Contribution Margin
|
|
|
|
S_ALR_87013588
|
Order Result
|
|
|
|
S_ALR_87013589
|
Actual/Plan/Variance
|
|
|
|
S_ALR_87013590
|
Current/Cumulative/Total
|
|
|
|
S_ALR_87013591
|
Payment Summarization: Overview
|
44
|
Calculating the Sales Price
|
SAP_PS_SALES_PRICING
|
DP81
|
Sales Pricing
|
45
|
Allocation Templates
|
SAP_PS_MODEL_PROJ
|
S_ALR_87004530
|
Create Selection Variants for Collective Processing
|
|
|
|
S_ALR_87005496
|
Stipulate Reposting Cycles
|
|
|
|
S_ALR_87007996
|
Maintain Templates
|
|
|
|
OKG1
|
Stipulate Capitalization Percentage Rates
|
|
|
|
S_ALR_87005128
|
Copying Costs and Revenues: Create Plan Version
|
|
|
|
S_ALR_87004530
|
Allocation: Create Selection Variants for Collective Processing
|
|
|
|
S_ALR_87005459
|
Allocation: Define Percentage Overhead
|
|
|
|
S_ALR_87005456
|
Allocation: Define Quantity-Based Overhead
|
|
|
|
KKE1
|
Base Object Costing: Create
|
|
|
|
KKE2
|
Base Object Costing: Change
|
|
|
|
KKE3
|
Base Object Costing: Display
|
46
|
Payment Reports
|
SAP_PS_REP_PAYMENTS
|
S_ALR_87100191
|
Payments: Receipts/Expenditures for a Fiscal Year
|
|
|
|
KSB5
|
Document Display: Actual Costs/Revenues
|
|
|
|
CJ3B
|
Document Display: Budget
|
|
|
|
CJIG
|
Document Display: Payments
|
|
|
|
S_ALR_87013573
|
Payments: Receipts/Expenditures for all Projects
|
|
|
|
S_ALR_87013575
|
Payments: Receipts
|
|
|
|
S_ALR_87013574
|
Payments: Expenditures
|
47
|
Payment Transfer for Project Period-End Closing
|
SAP_PS_PEREND_PROJ_PAYMENT
|
CJFN
|
Payment Transfer
|
Wednesday, April 17, 2013
PS Tcode Techincal
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment